Hi,
I just noticed the following:
* Select a transaction with an existing project entered
* Select TRANSACTION / ADD TO PROJECT
* Do not fill anything in the box (which comes up empty)
* Select CANCEL button
This results in the existing project id being removed. :?
I would have expected CANCEL to result in no changes to the existing transaction, even if the box is blank. Maybe if you selected OK it would replace the project from the transaction. However, I would have expected to be required to select the TRANSACTION / REMOVE FROM PROJECT to actually remove the project without entering a different project.
It's great that these buttons/hot keys eliminate the need to actually edit the transaction and hit the change button, but the ADD TO PROJECT selection should not remove the project as it currently is in my opinion.
Thanks.
I just noticed the following:
* Select a transaction with an existing project entered
* Select TRANSACTION / ADD TO PROJECT
* Do not fill anything in the box (which comes up empty)
* Select CANCEL button
This results in the existing project id being removed. :?
I would have expected CANCEL to result in no changes to the existing transaction, even if the box is blank. Maybe if you selected OK it would replace the project from the transaction. However, I would have expected to be required to select the TRANSACTION / REMOVE FROM PROJECT to actually remove the project without entering a different project.
It's great that these buttons/hot keys eliminate the need to actually edit the transaction and hit the change button, but the ADD TO PROJECT selection should not remove the project as it currently is in my opinion.
Thanks.